Hi guys,
Not sure where to post this, but I think this section is the most appropriate. Work has finally got under way at the treatment works that I work at for major improvements to the site. Work has been progressing slowly for a few months, mainly setting up site cabins, contractors cabins,and stores, also boundary fences have been set up. Now that the final land purchase has been sorted most of the major civil works can now start, at the moment not a great deal is going on, and not much plant on site, this will soon change as there is upwards of two years work and up to two hundred contractors will be on site. I hope to photograph as much as I can as and when I can and to update this photo site as often as possible
Have added more photos 31/03/2009
Added photos of the Solimec SR-70 Rotary rig owned and operated by Bachy Soletanche 22/04/09 also shots of the general area that construction will take place. The area that the rotary rig is on at the moment will be the site of a new sludge handling building, the other area will be for 4 x 40M dia primary settlement tanks and grit removal, there will be additional scrubbers built for odour control as well as smaller pumping stations, chemical storage and electrical sub stations.
More Photos added 30/04/2009
As work progresses I will be adding more photos. If you have any questions I will try and answer them, I hope you enjoy.
Just a few photos,
There are plenty more to be seen at my photo gallery over 350 photos so far, here is a linkhttp://steven-john-bird.digimig.co.uk/c1667207.html
Steve.
Wastewater treatment works improvements
-
- Posts: 856
- Joined: Sun Nov 18, 2007 2:00 pm
- Has thanked: 15 times
- Been thanked: 26 times
- Contact:
Re: Wastewater treatment works improvements
Great Pictures Steve, Thanks For Posting You think there will be any need for cranes on your site
Re: Wastewater treatment works improvements
Hi Jack,
There was details in the early days of planing for 2 tower cranes, but I think that idea has been scrapped, as construction continues I am sure there will be plenty of cranes on site, mainly mobile and possible some crawlers, watch this space.
Steve.
There was details in the early days of planing for 2 tower cranes, but I think that idea has been scrapped, as construction continues I am sure there will be plenty of cranes on site, mainly mobile and possible some crawlers, watch this space.
Steve.
Re: Wastewater treatment works improvements
Hi Guys,
Have added some more photos to the site showing the area where 4 38M dia primary tanks are to be constructed
Steve.
Have added some more photos to the site showing the area where 4 38M dia primary tanks are to be constructed
Steve.
-
- Moderator
- Posts: 4339
- Joined: Sun Aug 05, 2007 10:54 am
- Real name: martyn henley
- Has thanked: 38 times
- Been thanked: 50 times
- Flag:
Re: Wastewater treatment works improvements
Hi Steve, great pictures that you are showing .. but a couple of questions,
Where is the water treatment works and is Hawk the main muckshifters on the job ?
Martyn
Where is the water treatment works and is Hawk the main muckshifters on the job ?
Martyn
Re: Wastewater treatment works improvements
Hi Martyn,
Thanks for the kind words, the site is based just outside of Fleetwood in the North West of England near Blackpool just to clarify it is a Wastewater treatment works not water, we deal with the lumpy stuff and Hawk is the main muckshiting contractor.
Hope that helps Martyn any other questions just let me know and I will see if I can answer them.
Steve.
Thanks for the kind words, the site is based just outside of Fleetwood in the North West of England near Blackpool just to clarify it is a Wastewater treatment works not water, we deal with the lumpy stuff and Hawk is the main muckshiting contractor.
Hope that helps Martyn any other questions just let me know and I will see if I can answer them.
Steve.
-
- Moderator
- Posts: 4339
- Joined: Sun Aug 05, 2007 10:54 am
- Real name: martyn henley
- Has thanked: 38 times
- Been thanked: 50 times
- Flag:
Re: Wastewater treatment works improvements
Hi IBH,
Well spotted, you are indeed correct KMI is a joint venture partnership with Kier, Murphy and Interserve.
Steve.
Well spotted, you are indeed correct KMI is a joint venture partnership with Kier, Murphy and Interserve.
Steve.
Re: Wastewater treatment works improvements
Hi Guys,
Have recently updated photo gallery with photos from last few days, not a lot going on due to the heavy rain of late, there is a few photos of two piling rigs that arrived last week
More to been seen http://steven-john-bird.digimig.co.uk/c1667207.html
Steve.
Have recently updated photo gallery with photos from last few days, not a lot going on due to the heavy rain of late, there is a few photos of two piling rigs that arrived last week
More to been seen http://steven-john-bird.digimig.co.uk/c1667207.html
Steve.