Great Western Electrification project

Posted: Mon Dec 10, 2012 9:28 pm
by Ianto36
Hi All
Just to let you know what I am up to at the moment. I have been moved to the High output electrification train contract that is coming into the UK in April and will be responsible for training the operators. The piling and foundation consist is currently being built in Germany and work is progressing with some pace and the train consists of three piling hammers on Palfinger cranes(2 vibration and 1 percussion), a hitachi zaxis 135 excavator, falcon spoil wagon and concrete plant capable of producing 30m3. As soon as I can post some photos of the excavator I will and it will be an amazing piece of kit once finished. keep you updated.
Ian

Re: Great Western Electrification project

Posted: Mon Dec 10, 2012 11:04 pm
by FOWLER MAN
Hello Ian,
I look forward to seeing your photos of of that kit, sounds interesting.
Hope everything's ok. with you?
Fred

Re: Great Western Electrification project

Posted: Tue Dec 11, 2012 12:31 pm
by martyn williams
Hello Ian
I am working Christmas day on standby at a bridge renewal job at "pheasants curve " Newport , the job is on for three days
Martyn

Re: Great Western Electrification project

Posted: Thu Dec 13, 2012 8:38 pm
by lynchy
Sounds interesting,any jobs going?????? :thumbup:

Re: Great Western Electrification project

Posted: Thu Dec 13, 2012 8:51 pm
by martyn williams
Network rail and other contractors are always on the lookout for staff that are qualified for rail work.I will be on hand if there is a wagon or loco problem.I hope I can remain local and not get dragged to a job in another area like last Saturday. :dizzy: That was way of my patch.
Martyn

Re: Great Western Electrification project

Posted: Fri Dec 14, 2012 10:18 am
by Ianto36
Yes we are looking for staff for the project, excavator ops, crane ops piling staff concrete staff, with railway background or without, about 150 in total. You can apply via the Amey website or send a cv to me.