Great Western Electrification project
Posted: Mon Dec 10, 2012 9:28 pm
Hi All
Just to let you know what I am up to at the moment. I have been moved to the High output electrification train contract that is coming into the UK in April and will be responsible for training the operators. The piling and foundation consist is currently being built in Germany and work is progressing with some pace and the train consists of three piling hammers on Palfinger cranes(2 vibration and 1 percussion), a hitachi zaxis 135 excavator, falcon spoil wagon and concrete plant capable of producing 30m3. As soon as I can post some photos of the excavator I will and it will be an amazing piece of kit once finished. keep you updated.
Ian
Just to let you know what I am up to at the moment. I have been moved to the High output electrification train contract that is coming into the UK in April and will be responsible for training the operators. The piling and foundation consist is currently being built in Germany and work is progressing with some pace and the train consists of three piling hammers on Palfinger cranes(2 vibration and 1 percussion), a hitachi zaxis 135 excavator, falcon spoil wagon and concrete plant capable of producing 30m3. As soon as I can post some photos of the excavator I will and it will be an amazing piece of kit once finished. keep you updated.
Ian