Post #1 by martyn williams » Wed Sep 05, 2007 6:01 pm

Worked the machine for around four hours in hard ground,went well only fault was a leaking low pressure return hose on valve block.
Pictures show machine levelling the land around the stables
You do not have the required permissions to view the files attached to this post.


Topic author
martyn williams
Posts: 6393
Joined: Mon Nov 03, 2008 8:06 pm
Real name: MARTYN WILLIAMS
Location: South Wales
Has thanked: 296 times
Been thanked: 359 times

Re: 125 DROTT WORKOUT

Post #2 by martyn williams » Sun Sep 09, 2007 12:10 pm

125 at rest after its workout. This part of the job is nearly done.Only problems have been a battery earth strap and a minor hydraulic leak. Once this task is complete the machine will be loading a few hundred ton of stone into a dumper then fill in the area with the spoil dug out from the first job.Enjoyed the workout with the 125.
You do not have the required permissions to view the files attached to this post.