This 365 is in for a swing bearing replacment, although it looks a bit ropey on those 4 stands, its very stable. The stands have hydraulic cylinders on them so once everyhting is disconnected you lift the machine off the bottom half using the four jacks. One of the boom cylinders is replaced with a stiff bar. final drives are dissasembled to allow the undercarriage to freewheel and it is dragged out from under the upper structure.
SB
365 in two halfs
-
- Moderator
- Posts: 8667
- Joined: Sun Aug 05, 2007 8:36 pm
- Real name: Jeremy Rowland
- Has thanked: 1867 times
- Been thanked: 1688 times
-
Topic author - Posts: 1247
- Joined: Tue Oct 02, 2007 4:21 pm
- Real name: Stu Bickley
- Location: Hednesford
- Has thanked: 70 times
- Been thanked: 116 times
- Flag:
Re: 365 in two halfs
Just an update on this job...
Car body has several major cracks, so track frames have been removed for the welding repair to be carried out.
SB
Car body has several major cracks, so track frames have been removed for the welding repair to be carried out.
SB
You do not have the required permissions to view the files attached to this post.
He who hingeth aboot, getteth hee-haw