Stobswood Backfilling
Stobswood Backfilling
Took these today or the 777 C and Ds backfilling at stobswood . Heres a few to start
You do not have the required permissions to view the files attached to this post.
Re: Stobswood Backfilling
Looks a canny way on What i could see to ready for some to move to sort sub and top soil
Re: Stobswood Backfilling
A few more got a good few more if anyone wants to see
You do not have the required permissions to view the files attached to this post.
-
- Posts: 85
- Joined: Sun Nov 09, 2008 9:09 am
- Real name: scott
- Location: Finning Boldon
Re: Stobswood Backfilling
they were sold to a cat dealer in the us, they were stripped on site and shipped from blyth docks, each truck was to under go a full strip down and rebuild program to extend the life of the trucks, im not sure if they were sold on wards to the north american coal company who also is the proud owner of the ace of spades, stobswood has around 2 year back filling in total.
Re: Stobswood Backfilling
Just looked at Uk Coals website and says it will be back by end of 09
Coaling at North Stobswood Revised is expected to be completed by the end of 2008 and both sites will be fully restored by the end of 2009.
Coaling at North Stobswood Revised is expected to be completed by the end of 2008 and both sites will be fully restored by the end of 2009.
Re: Stobswood Backfilling
A few more
You do not have the required permissions to view the files attached to this post.
-
- Posts: 693
- Joined: Wed Jun 20, 2007 8:56 pm
- Real name: Ross
- Has thanked: 1 time
- Been thanked: 27 times
Re: Stobswood Backfilling
macca1 wrote:Im saying Cs and Ds there is some Bs too Where did the 798s go anyone???
Nice Pic's Mate
After Crouch's where finished with the 789's they where done ... I mean DONE!!!
Bank's bought the two 789B's and are still working today at Delhi.
Return to “Haulers/Dump Trucks”
Who is online
Users browsing this forum: No registered users and 28 guests